Final Inspection

  • Schedule an inspection online for final inspection when the construction has been completed.
    • All external surfaces must be painted, or otherwise sealed, weather-stripping must be installed on all new windows and doors, and all electrical or plumbing fixtures have been installed. Interior painting, wallpapering, or carpeting need not be complete.
    • Smoke detectors must be installed in all bedrooms, located at the top of a staircase and in the hallway/corridor leading to the bedrooms.