Cesar Chavez Day closure March 31
Santa Ana City Hall, libraries and community centers will be closed on Monday, March 31, 2025, in observance of Cesar Chavez Day.
There will be no street sweeping on March 31, but trash and recycling will be collected.

FAQ Topic: CEES Compliance forms

Installation Certificate – CF – 6R – MECH – HERS

CF-6R-MECH-21-HERS – Duct Leakage Test – Existing Duct System CF-6R-MECH-22-HERS – HSPP/PSPP Installation; Cooling Coil Airflow & Fan Watt Draw Test CF-6R-MECH-23-HERS – Verification of High EER Equipment CF-6R-MECH-24-HERS – Change Indicator Display (CID) CF-6R-MECH-25-HERS – Refrigerant Charge Verification – Standard Measurement Procedure CF-6R-MECH-26-HERS – Refrigerant Charge Verification – Alternate Measurement Procedure CF-6R-MECH-27-HERS – Maximum … Continued

Installation Certificate – CF – 6R – Mech

CF-6R-MECH – 02 – Solar Domestic Hot Water Systems (SDHW) CF-6R-MECH – 03 – Pool and Spa Heating Systems CF-6R-MECH – 04 – Space Conditioning Systems, Ducts, and Fans CF-6R-MECH – 05 – Indoor Air Quality and Mechanical Ventilation CF-6R-MECH – 06 – Evaporatively Cooled Condensing Units CF-6R-MECH – 07 – Evaporative Coolers CF-6R-MECH – … Continued

Worksheets – WS

WS-1R – Thermal Mass Worksheet WS-2R – Area Weighted Average Calculation Worksheet WS-3R – Solar Heat Gain Coefficient (SHGC) Worksheet

Certificate of Compliance -CF-1R

CF-1R – Certificate of Compliance: Residential New Construction CF-1R – ADD Certificate of Compliance: Residential Additions CF-1R – ALT Certificate of Compliance: Residential Alterations

Close window